Aucotec at the VDE Congress „Schutz- und Leittechnik“ 2026 in Leipzig

  Engineering Base 2026 consistently advances the digital substation Greater efficiency, less complexity – one system across the entire lifecycle World’s first fully integrated IEC 61850 within a seamless engineering platform Digital substations are not created by new buzzwords. They Mehr

AUCOTEC: Engineering Dialogue at Eye Level in Stavanger

When operators, EPCs (Engineering, Procurement and Construction companies) and technology partners meet at the heart of Norway’s energy industry, the result is more than a traditional user meeting – it becomes a strategic dialogue about the future of engineering. This Mehr

Johnson Matthey und Aucotec: Digital Engineering for a Net-Zero Future

Johnson Matthey’s Catalyst Technologies business is a global leader in sustainable technologies. The business uses advanced engineering technology and expertise in catalysis chemistry to provide solutions for customers to decarbonise and increase the yield and efficiency of their chemical processes. Mehr

Aucotec to present the world’s first full integration of IEC 61850 in Engineering Base

No external tools, no media disruptions: first complete integration of IEC 61850 into an end-to-end engineering platform More efficient, more secure and ready for the future: shorter engineering times, maximum interoperability and a streamlined IT landscape for grid operators and Mehr

World’s first full integration of IEC 61850 into plant engineering with Engineering Base

At the Smart Grid Technical Forum 2025 being held on March 18-20, 2025 in The Hague, Netherlands, Aucotec AG will present the world’s first complete integration into plant engineering of the control technology definition of substations according to IEC 61850. Mehr

Westfalen Group Future-Proofs Its Processes with Aucotec

Centralized data platform: Aucotec’s Engineering Base optimizes engineering and maintenance processes and preserves valuable know-how. Next-level digitalization: SAP integration and AI-driven workflows increase transparency, reduce errors, and improve data quality. Driver of innovation: Engineering Base enables significant advancements in technological Mehr

Aker BP Selects Aucotec to Drive Operational Efficiency in Yggdrasil

Strategic Contract: Aker BP chooses Aucotec’s Engineering Base to implement Engineering Design Data Management (EDDM) for the Yggdrasil development project. Driving Innovation: Engineering Base delivers a ready-to-deploy platform for seamless, data-driven workflows. Future-Proof Operations: The collaboration enables true As-Built data Mehr

Aucotec at InnoTrans 2024

Engineering Base: single source of truth for the electrical design, operation and maintenance of rail vehicles Premiere in Berlin: technology partnership between Aucotec and Altair opens up new possibilities for operation start-up and servicing of rail vehicles Customers benefit from Mehr

CIGRE 2024: Aucotec blazes a trail by bridging the worlds of hardware and software

Cooperation platform Engineering Base provides data backbone for the entire life cycle of substations Full integration of IEC 61850: engineering platform maps the substation’s complete life cycle Seamless engineering solution for planning primary and secondary equipment hardware as well as Mehr

Aucotec personnel news: Dr. Florian Jurecka takes over as new Vice President Global Sales and Marketing

Dr. Florian Jurecka (49) was appointed to the newly created post of Vice President Global Sales and Marketing at Aucotec AG on June 1, 2024. Reporting directly to the Board of Management, Dr. Jurecka will be responsible for the strategic Mehr